Construction of PPPsChelnik 2

No image

The built power plant transforms solar radiation into electricity through polycrystalline photovoltaic modules generating direct current and voltage. The resulting voltage is transformed into an alternating voltage by three-phase invertors, then increased to 20kV and the generated electricity is supplied to the medium-voltage distribution grid of the country.

According to the project, a concrete complete indoor distribution system (BKZRU 20kV), with two inputs,was installed on the site of the power plant. A transformer 1000 kVАwas installed in it. The MV distribution system was equipped with a switchgear (KRU) 20 kV, 630 А, 16 kА. Two transforming stations of the type VM01 0,4/20 kV to 1000kVА wereinstalled on the site of the power plant. Each of them was equipped with MV distribution system, with switchgear (KRU) 20 kV, 630А, 16kА.
Along the property perimeter, a wire fence was built, lighting columns were installed, access control system and video surveillance were built.

Project value: BGN 14,4million
Date of completion of the construction and installation works: 10.06.2011

Нагоре