In the portfolio ofMinstroyHolding, there are fivephotovoltaic power plantswith a total installed power of 14,8MWh.
1. ‘Light –Chelnik’ Photovoltaic Power Plant - 3,2 MWp, located in the village of Chelnik, municipality of Tundzha;
2. ‘Helios –Chelnik’ Photovoltaic Power Plant - 3,0 MWp, located in the village of Chelnik, municipality of Tundzha;
3. ‘Forest–Gabarevo’ Photovoltaic Power Plant - 2,6 MWp, village of Gavarevo, municipality of PavelBanya;
4. ‘Mechkarevo Invest’ Photovoltaic Power Plant - 3,0 MWр, village of Mechkarevo, municipality of Sliven;
5. ‘Mechkarevo Energy’ Photovoltaic Power Plant - 3,0MWp, located in the village of Mechkarevo, municipality of Sliven.
The investment was made in the period 2011-2012 both by own funds and by project funds provided by one of the largest German banks – BayernLandesbank. Each plant is equipped with German photovoltaic modules and inverters and operates through a subsidiary of the holding company. The average annual output of the photovoltaic plants amounts to more than 20 000 МW.