In the portfolio ofMinstroyHolding, there are fivephotovoltaic power plantswith a total installed power of 14,8MWh.

1.    ‘Light –Chelnik’ Photovoltaic Power Plant - 3,2 MWp, located in the village of Chelnik, municipality of Tundzha;

2.    ‘Helios –Chelnik’ Photovoltaic Power Plant - 3,0 MWp, located in the village of Chelnik, municipality of Tundzha;

3.    ‘Forest–Gabarevo’ Photovoltaic Power Plant - 2,6 MWp, village of Gavarevo, municipality of PavelBanya;

4.    ‘Mechkarevo Invest’ Photovoltaic Power Plant - 3,0 MWр, village of Mechkarevo, municipality of Sliven;

5.    ‘Mechkarevo Energy’ Photovoltaic Power Plant - 3,0MWp, located in the village of Mechkarevo, municipality of Sliven.

The investment was made in the period 2011-2012 both by own funds and by project funds provided by one of the largest German banks – BayernLandesbank. Each plant is equipped with German photovoltaic modules and inverters and operates through a subsidiary of the holding company. The average annual output of the photovoltaic plants amounts to more than 20 000 МW.