Closure and rehabilitation of 4 (four) existing landfill sites in Sevlievo Municipality, Gabrovo Reg

No image

Name of the project:

“Closure and rehabilitation of 4 (four) existing landfill sites in Sevlievo Municipality, Gabrovo Region”

Assignor:

Ministry of Environment and Water

Main contractor:

„Minstroy Holding“ AD

Information for the project:

According to the contract signed, construction and reclamation activities, including removal and transportation of the waste from the existing landfills to the Regional Waste Landfill in Sevlievo, were performed in accordance with the approved working designs for the following sites:

  • ‘Closure and reclamation of the existing landfill in the village of Agatovo, area of ‘Kameno pole’, municipality of Sevlievo’ – landfill for non-hazardous municipal waste;
  • ‘Closure and reclamation of the existing landfill in the village of Gradnitsa, area of ‘Banchova usoina’, municipality of Sevlievo’ – landfill for non-hazardous municipal waste;
  • ‘Closure and reclamation of the existing landfill in the village of Dushevo, area of ‘Pod seloto’, municipality of Sevlievo’ – landfill for non-hazardous municipal waste;
  • ‘Closure and reclamation of the existing landfill in the village of Krushevo, area of ‘Vratnyaka’, municipality of Sevlievo’ – landfill for non-hazardous municipal waste.

The construction and reclamation works for technical reclamation, biological reclamation and vegetation care were performed in accordance with the approved working designs until the acceptance of the sites by a Commission under the procedure of Article 20 of Ordinance No. 26/02.10.1996 on the rehabilitation of damaged terrains, improvement of low-productive lands, reclamation and recovery of humus layer. The necessary raw materials and supplies were delivered; the machinery, workforce and all other services and activities necessary to perform the construction and reclamation activities were provided in accordance with the designs and the specification.

Temporary construction, temporary traffic organization and other temporary activities were performed during the implementation of the contract.

Implementation period:

2017